Close
2026 Taiwan Int'l Tools & Hardware Expo x Int'l Hardware Expo Taiwan (TiTE x IHT)

Canadas Fort Hills Oil Sands Project Achieves First Oil

Note* - All images used are for editorial and illustrative purposes only and may not originate from the original news provider or associated company.

Related stories

Korea Zinc’s Project Crucible Gains Traction in US Critical Minerals Push

Korea Zinc's ambitious $7.4 billion Tennessee smelter project, known...

DOE Launches $100 Million Critical Minerals Workforce Initiative

The US Department of Energy's Office of Critical Minerals...

US Announces $3 Billion in Critical Minerals Projects to Reduce China Dependence

President Donald Trump unveiled approximately $3 billion in investments...

Teck Resources Limited announced that first oil has been achieved at the Fort Hills Project.

Suncor, as operator of the Fort Hills Energy Limited Partnership, has confirmed that the Fort Hills project is ramping up production following the safe startup of secondary extraction on January 27, 2018. As expected, the first of three trains from secondary extraction is now online and production on this train will continue to ramp up through the first quarter.

โ€œWe are pleased to reach this important milestone. The production of first oil at Fort Hills is the culmination of the hard work of thousands of people since the project was sanctioned by the Fort Hills partners in 2013,โ€ said Don Lindsay, President and CEO. โ€œWe look forward to the ramp up to full production and to the continued growth of our energy business. Fort Hills is a long-life asset that will generate significant value for our company for decades to come. Its life cycle carbon intensity is projected to be lower than approximately half of the oil refined in North America.โ€

The project has already completed five test runs of the front end of the plant, producing 1.4 million barrels of froth. The froth was trucked to Suncorโ€™s base plant for further processing.

The second and third trains of secondary extraction are being insulated and are expected to start up in the first half of 2018, as planned. Fort Hills remains on track to reach 90% of nameplate capacity of 194,000 bbls/d by the end of 2018. Suncor has guided toward cash operating costs per barrel for Fort Hills of $20-$30/bbl by the 4th quarter of 2018.

About Teck
Teck is a diversified resource company committed to responsible mining and mineral development with major business units focused on copper, steelmaking coal, zinc and energy. Headquartered in Vancouver, Canada, its shares are listed on the Toronto Stock Exchange under the symbols TECK.A and TECK.B and the New York Stock Exchange under the symbol TECK. Learn more about Teck at www.teck.com

Media Contact:
Chris Stannell
Senior Communications Specialist
604.699.4368
chris.stannell@teck.com

Investor Contact:
Fraser Phillips
Senior Vice President, Investor Relations and Strategic Analysis
604.699.4621
fraser.phillips@teck.com

Mining Frontier brings together the global mining industry โ€” from exploration and extraction specialists to processing operators and mineral supply chain leaders โ€” through trusted editorial, market intelligence, and digital engagement.

Our 2026 Media Pack offers integrated solutions to reach your audience:

  • Magazine & Digital Editions Showcase your brand within premium mining industry coverage read by executives and decision - makers worldwide.
  • Industry Insights & Reports Align with data - driven analysis, trend reports, and regional roundups across the global mining and resources value chain.
  • Brand Authority & Credibility Position your company as a thought leader through expert commentary, interviews, and special features.

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

โ€“ Access the Media Pack Now

โ€“ Book a Conference Call

โ€“ Leave Message for Us to Get Back

Latest stories

Related stories

Korea Zinc’s Project Crucible Gains Traction in US Critical Minerals Push

Korea Zinc's ambitious $7.4 billion Tennessee smelter project, known...

DOE Launches $100 Million Critical Minerals Workforce Initiative

The US Department of Energy's Office of Critical Minerals...

US Announces $3 Billion in Critical Minerals Projects to Reduce China Dependence

President Donald Trump unveiled approximately $3 billion in investments...

Equinox Orla Merger Creates Major North American Gold Producer

The Equinox Orla Merger has been completed, bringing together...

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

โ€“ Access the Media Pack Now

โ€“ Book a Conference Call

โ€“ Leave Message for Us to Get Back

Translate ยป