Close
2026 Taiwan Int'l Tools & Hardware Expo x Int'l Hardware Expo Taiwan (TiTE x IHT)
ACHEMA MIDDLE EAST 2026

Anax Metals brings Gekko in for process plant design at Whim Creek copper mine

Note* - All images used are for editorial and illustrative purposes only and may not originate from the original news provider or associated company.

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

Leave Message for Us to Get Back

Related stories

Nigeria and Türkiye Sign Mining Cooperation Agreement

Nigeria and Türkiye have agreed on a new MoU...

Copper Demand Rising Through Grid Modernization Plans

Electrifying the global economy requires a massive upgrade to power distribution networks. Copper remains the essential conductor for smart grids and renewable energy integration, driving a historic surge in demand as nations modernize their aging electrical infrastructure for a sustainable future.

China Mulling Extraction of Critical Metals from Coal Waste

A new report says China ought to think about...

Anax Metals Limited has appointed Gekko Systems as process plant design consultant to assist with the design process of a polymetallic sulphide concentrator plant at the Whim Creek copper mine in Western Australia.

The concentrator plant will be designed to process approximately 320,000 t/y of pre-concentrate, with feedstock for the concentrator consisting of primary sorted ore and upgraded fines from the gravity circuit.

Anax plans to design the process plant and associated infrastructure such that it may be fabricated and assembled on skids, in a factory, prior to transportation and installation on site. This strategy delivers many significant benefits and reduces site related construction risks.

Anax’s Managing Director, Geoff Laing, said: “We are very pleased to be working with the Gekko team and look forward to delivering a cost-effective modular plant for Whim Creek. Modularisation is a key element of the ‘Anax Blueprint’ which is expected to deliver leveraged outcomes to our projects.”

Never miss a mining headline

The mining industry moves fast – stay on top of it with our must - read briefings.

  • The top mining and resources stories, straight to your inbox
  • The biggest news, features, interviews, and analysis
  • Dedicated coverage of the key developments shaping global mining and mineral markets

Latest stories

Related stories

Nigeria and Türkiye Sign Mining Cooperation Agreement

Nigeria and Türkiye have agreed on a new MoU...

Copper Demand Rising Through Grid Modernization Plans

Electrifying the global economy requires a massive upgrade to power distribution networks. Copper remains the essential conductor for smart grids and renewable energy integration, driving a historic surge in demand as nations modernize their aging electrical infrastructure for a sustainable future.

China Mulling Extraction of Critical Metals from Coal Waste

A new report says China ought to think about...

When Geological Knowledge Expands Resource Mapping Becomes More Accurate: Z-Library

Geological knowledge grows layer by layer much like a...

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

Leave Message for Us to Get Back

Translate »