Close
2026 Taiwan Int'l Tools & Hardware Expo x Int'l Hardware Expo Taiwan (TiTE x IHT)
ACHEMA MIDDLE EAST 2026

Anglo American receives operating licence for Minas-Rio tailings facility

Note* - All images used are for editorial and illustrative purposes only and may not originate from the original news provider or associated company.

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

โ€“ Access the Media Pack Now

โ€“ Book a Conference Call

โ€“ Leave Message for Us to Get Back

Related stories

Hyundai Enters $2bn North American Critical Minerals Market

Hyundai Engineering has taken an important step toward growing...

Imwelo Gold Project, A Tanzania Gold Mine to Be Gold Funded

Lake Victoria Gold Ltd. is advancingย the Tanzanian regulatory process,...

KEFI Signs Mining Services Contract of $400m With BCM Group

Exploration company KEFI Gold and Copper -ย KEFI signs $400m...

Anglo American announces that it has received the next phase of its operating licence for its Minas-Rio tailings facility in Brazil, following the work to raise the dam as part of the Step 3 licence area of the mine. The regulatory authorities in Brazil granted the installation licence for this work in January 2018 and the construction work was completed in accordance with that licence in August 2019.

Seamus French, CEO of Bulk Commodities at Anglo American, said: โ€œThis is an important milestone for our Minas-Rio iron ore operation in Brazil towards reaching its full potential. Minas-Rio has a long asset life of 48 years and produces a high grade, premium quality product for our customers, supporting lower emissions in the steel industry. We expect Minas-Rio to produce 23 million tonnes in 2019, with an FOB unit cost of c.US$24 per tonne.โ€

The Minas-Rio tailings dam uses a downstream construction design and is an embankment dam structure, built using compacted imported earth-fill material, with carefully selected granular materials for the drainage and filter zones. Tailings are not used to build the dam, and instead construction materials are placed in controlled layers. This is a conservative and high quality design for a tailings dam, being designed and built as a water-retaining type of dam.

Never miss a mining headline

The mining industry moves fast โ€“ stay on top of it with our must - read briefings.

  • The top mining and resources stories, straight to your inbox
  • The biggest news, features, interviews, and analysis
  • Dedicated coverage of the key developments shaping global mining and mineral markets

Latest stories

Related stories

Hyundai Enters $2bn North American Critical Minerals Market

Hyundai Engineering has taken an important step toward growing...

Imwelo Gold Project, A Tanzania Gold Mine to Be Gold Funded

Lake Victoria Gold Ltd. is advancingย the Tanzanian regulatory process,...

KEFI Signs Mining Services Contract of $400m With BCM Group

Exploration company KEFI Gold and Copper -ย KEFI signs $400m...

Epiroc, Ericsson Partner for LTE, 5G Connectivity in Mining

Epiroc, which happens to be a Swedish mining and...

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

โ€“ Access the Media Pack Now

โ€“ Book a Conference Call

โ€“ Leave Message for Us to Get Back

Translate ยป