Close
2026 Taiwan Int'l Tools & Hardware Expo x Int'l Hardware Expo Taiwan (TiTE x IHT)
ACHEMA MIDDLE EAST 2026

Diamond Fields in Discussions with TMH to Further Advance Beravina Project

Note* - All images used are for editorial and illustrative purposes only and may not originate from the original news provider or associated company.

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

Leave Message for Us to Get Back

Related stories

Nigeria and Türkiye Sign Mining Cooperation Agreement

Nigeria and Türkiye have agreed on a new MoU...

China Mulling Extraction of Critical Metals from Coal Waste

A new report says China ought to think about...

When Geological Knowledge Expands Resource Mapping Becomes More Accurate: Z-Library

Geological knowledge grows layer by layer much like a...

Diamond Fields Resources Inc. is pleased to announce that discussions are ongoing with TMH Acquisition Co concerning the further advancement of its Beravina project pursuant to the agreement with TMH entered into on 16 May 2019. The Cooperation Agreement was extended, on 11 November 2019, to 31 May 2020 without financial penalty due to various delays in the implementation of the intended work program, which were previously reported (see DFR Press Release 11 November 2019). An announcement will be made by the Company once these discussions are complete.

In addition, the Company is pleased to report that a programme of drilling was concluded. A total of 13 diamond core drill holes, aggregating 906.16 metres of drilling, was completed on the Beravina deposit. The results from TMH and its technical advisors will be announced by DFR shortly.

About Beravina

The Beravina Project is a hard rock zircon deposit with a NI 43-101 Inferred Mineral Resource estimate of 1.5 million tons at 22.7% zircon (ZrSiO4) equivalent to 15.3% ZrO2 (see the NI 43-101 Technical Report, with an effective date of 14 December 2018 and filed on the Company’s SEDAR profile on 29 January 2019) written by MSA Group (Pty) Ltd. (Michael S. Cronwright, Pr.Sci.Nat., FGSSA, John Derbyshire, Pr.Eng., FSAIMM, Jeremy Witley, Pr.SCI.Nat., FGSSA and Andre van der Merwe, Pr.Sci.Nat., MAusIMM, FGSSA), each of whom is a “qualified person” for purposes of NI 43-101, and independent of the Company as defined in NI 43-101. The Project, which covers 625 hectares, is located in Western Madagascar. Results so far show that, utilizing industry standard beneficiation technologies, zircon can be concentrated to levels of between 50% ZrO2 and 58% ZrO2 with varying levels of thorium ingrained.

Never miss a mining headline

The mining industry moves fast – stay on top of it with our must - read briefings.

  • The top mining and resources stories, straight to your inbox
  • The biggest news, features, interviews, and analysis
  • Dedicated coverage of the key developments shaping global mining and mineral markets

Latest stories

Related stories

Nigeria and Türkiye Sign Mining Cooperation Agreement

Nigeria and Türkiye have agreed on a new MoU...

China Mulling Extraction of Critical Metals from Coal Waste

A new report says China ought to think about...

When Geological Knowledge Expands Resource Mapping Becomes More Accurate: Z-Library

Geological knowledge grows layer by layer much like a...

Fresh Investment Cycle in Gold Mining Sector in Zimbabwe

There is a fresh investment cycle in the gold...

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

Leave Message for Us to Get Back

Translate »