Close
2026 Taiwan Int'l Tools & Hardware Expo x Int'l Hardware Expo Taiwan (TiTE x IHT)
ACHEMA MIDDLE EAST 2026

CuDeco awards Rocklands copper mining contract to Andy’s Earthmovers

Note* - All images used are for editorial and illustrative purposes only and may not originate from the original news provider or associated company.

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

Leave Message for Us to Get Back

Related stories

Copper Demand Rising Through Grid Modernization Plans

Electrifying the global economy requires a massive upgrade to power distribution networks. Copper remains the essential conductor for smart grids and renewable energy integration, driving a historic surge in demand as nations modernize their aging electrical infrastructure for a sustainable future.

Funding $1.3bn for Zambia Rail Project to Help Copper Mines

International financiers have gone ahead with funding $1.3bn for...

True North Copper Drills for Copper Discovery in Australia

True North Copper has fired the rigs on its Mt Oxide...

Queensland-based copper producer CuDeco has awarded Andy’s Earthmovers the mining contract to resume Stage 1 of production at Australia’s Rocklands Copper Mine.            

Andy’s Earthmovers was given an initial Phase-1, six-month fixed-rate contract for the first part of mining of the Las Minerale Stage-2 Pit.Phase 1 comprises mining of nearly 1.2Mt of ore and 3.8Mt of waste from the Las Minerale 2 Pit to an RL of 145m, approximately 35m-40m below the current Las Minerale 2 Pit floor.

CuDeco has agreed to provisionally award Phase 2 works to Andy’s Earthmovers. This contract involves mining the remainder of the Las Minerale, Rocklands South, Rocklands South extended and Rainden pits, but is dependent on the performance of Phase 1.

“Phase 1 comprises mining of nearly 1.2Mt of ore and 3.8Mt of waste from the Las Minerale 2 Pit.” CuDeco will provide all management and technical control of the mining contract.

Mining is expected to start from the middle of the next month.Under the contract, Andy’s Earthmovers will start mobilisation immediately. It will be responsible to provide a full-service mining model, which will involve performing loading and hauling, drilling and blasting, in-pit dewatering and waste dump rehabilitation services at the project.

It will also be responsible for fleet and road maintenance.Andy’s Earthmovers has vast experience as a mining contractor. Currently, it is performing work under the life of mine contract, awarded by Hillgrove Resources, at the Kanmantoo Copper Mine in Australia

Mining Frontier brings together the global mining industry — from exploration and extraction specialists to processing operators and mineral supply chain leaders — through trusted editorial, market intelligence, and digital engagement.

Our 2026 Media Pack offers integrated solutions to reach your audience:

  • Magazine & Digital Editions Showcase your brand within premium mining industry coverage read by executives and decision - makers worldwide.
  • Industry Insights & Reports Align with data - driven analysis, trend reports, and regional roundups across the global mining and resources value chain.
  • Brand Authority & Credibility Position your company as a thought leader through expert commentary, interviews, and special features.

Latest stories

Related stories

Copper Demand Rising Through Grid Modernization Plans

Electrifying the global economy requires a massive upgrade to power distribution networks. Copper remains the essential conductor for smart grids and renewable energy integration, driving a historic surge in demand as nations modernize their aging electrical infrastructure for a sustainable future.

Funding $1.3bn for Zambia Rail Project to Help Copper Mines

International financiers have gone ahead with funding $1.3bn for...

True North Copper Drills for Copper Discovery in Australia

True North Copper has fired the rigs on its Mt Oxide...

First Phase Drilling Starts at Condobolin Mineral Field

The first phase drilling program is being conducted at the...

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

Leave Message for Us to Get Back

Translate »